Approval of Building Plan
Approval of Building Plan

Application seeking No Objection Certificate (NOC) for electrical clearance of residential, commercial and industrial building before construction required under Regulation 62 of the Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations, 2023 and as per provisions of Tripura Building Rules, 2017 including amendments thereof.

NOTE :

  • Electrical clearance certificate is required for erection, addition to or alteration of any Residential building upto 15 metres in height and / or having covered area upto 1000 sq m as the case may be.
  • Electrical clearance certificate is required for erection, addition to or alteration of any commercial or Industrial building upto 15 metres in height and / or having covered area upto 500 sq m as the case may be.
  • The Electrical Inspector may visit the proposed site of construction regarding inspection of vertical and horizontal clearance of lines of voltage and service lines not exceeding 650 Volts from proposed construction of building before issuing the NOC.
  • No Objection Certificate (NOC) is obtained through the online system for Building Plan Approval.